Announcement of Environmental Impact Assessment of Fastener Surface Treatment and Processing Project of Wuhu Luoerke Precision Industry Co., Ltd.
| 2019-01-30

1. Brief description of the construction project

Project Name: Wuhu Luoerke Precision Industry Co., Ltd. Fastener Surface Treatment Project

Project nature: new construction

Construction content: The total investment of the project is 9 million yuan, and the surface treatment production line will be built. The annual production scale: 1,600 tons of electro-galvanized nickel alloy, 2,400 tons of electro-galvanized, 800 tons of phosphating and pickling.

2. Overview of possible impacts of construction projects on the environment

1. Exhaust gas: The project produces sulfuric acid mist, hydrochloric acid mist and natural gas boiler combustion exhaust gas.

2. Wastewater: The project produces domestic sewage and production wastewater. Production wastewater includes production process wastewater, workshop ground washing wastewater, waste gas treatment tower wastewater, etc.

3. Noise: The main noise equipment of the project includes exhaust gas exhaust fans, water pumps, etc., and the noise source intensity is between 60dB(A) and 85dB(A).

4. Solid waste: The main solid waste generated by the project is the domestic waste of employees, the waste residue generated by the regular replacement of various process tanks, the filter element of the filter, and the waste packaging materials of chemicals, etc.

3. Main points of countermeasures and measures to prevent or mitigate adverse environmental impacts

1. Exhaust gas: The acid mist generated by the project is collected by the gas collecting hood at the side of the tank, and then is treated by the spray scrubber, and then discharged through the exhaust pipe at high altitude; the combustion exhaust gas generated by the project is discharged through the exhaust pipe at high altitude.

2. Wastewater: The domestic sewage generated by the project is pretreated in a septic tank, and after reaching the takeover standard, it is discharged into the Wuhu County Wastewater Treatment Plant for unified treatment; after the production wastewater of the project is collected by classification and quality, it is discharged into the Anhui Shuiyun Electroplating Wastewater Treatment Co., Ltd. The electroplating center wastewater treatment station operated by the company is in charge of the corresponding wastewater treatment device for unified treatment, and finally enters Wuhu County Wastewater Treatment Plant for unified treatment, and discharges it into Zhaojia River after the treatment reaches the standard.

3. Noise: After rational layout, sound insulation, shock absorption and noise reduction treatment of equipment, the project can ensure that the noise emission at the factory boundary meets the standard; the project mainly controls high noise sources, such as installing silencers for fans.

4. Solid waste: Hazardous waste such as waste slag and waste chemical packaging materials generated by the project will be collected by Anhui Shuiyun Electroplating Wastewater Treatment Co., Ltd. and handed over to units with relevant hazardous waste qualifications for treatment; domestic waste will be cleared and transported by the sanitation department.

4. Main points of the conclusion of environmental impact assessment

The project complies with local planning requirements, national and local industrial policies and clean production requirements, and adopts various environmental protection facilities to ensure the long-term and stable discharge of various pollutants up to the standard. Overall, the impact on the environment of the evaluation area is small and will not cause regional pollution. Changes in the function of the environment. Under the premise that the project earnestly implements the environmental protection measures proposed in this report and strengthens environmental management, the environmental impact can be reduced to a minimum or acceptable level. Therefore, from the perspective of environmental protection, the construction of the project is feasible.

5. The method and time limit for public access to further request for supplementary information

If the public needs to consult other further information, they can call or write to the construction unit or the environmental assessment unit.

6. Scope and main matters of soliciting public opinions

The scope of soliciting public opinions this time is mainly sensitive points such as enterprises and institutions around the project and surrounding villages. Units and individuals are invited to express their views on environmental protection issues and suggestions related to the project.

7. Specific forms and channels for soliciting public opinions

Relevant members of the public can call or write to the construction unit or environmental impact assessment unit, or express their individual or group opinions in writing, and suggest that individuals should truthfully fill in their names and contact information, and units should truthfully fill in their contact addresses and affix their official seals to facilitate future contact and communication , The full text of the draft environmental impact report and the format of the solicitation form are detailed on the website of the construction unit.

public comment form.docx

8. The starting and ending time of public comments

10 working days after the announcement.

9. Contact information of the construction unit

Construction unit: Wuhu Luoerke Precision Industry Co., Ltd.

Address: Electroplating Industrial Park, Xinwu Economic Development Zone, Anhui

Contact: Mr. Yang Tel: 15258722627

10. Contact information of EIA units

Environmental impact assessment unit: Zhejiang Huanyao Environmental Construction Co., Ltd.

Certificate number: National Environmental Assessment Certificate B Zi No. 2046

Address: 4th Floor, Comprehensive Building, Tuofeng Science and Technology Park, No. 48, Huanggushan Road, Xihu District, Hangzhou

Contact: Xia Gong Email:3496907782@qq.com  contact number:13064706749


Wuhu Luoerke Precision Industry Co., Ltd.

  • Gender
  • Language
  • Function